pumped out the water, installed the 14' ramps off of the low water bridge, scooped out the rocks and gravel, making the pool ready for summer. The 4210 HydroStatic drive worked great, needed the 4WD to pull the grade up the wet ramps. Don't tell OSHA.
↧